Commit Graph

63 Commits

Author SHA1 Message Date
Luca 09c2c107e0 Move reset button and add tooling holes to paste layer 2021-07-09 15:12:49 +02:00
Luca ccf6fbddce Move capacitor references 2021-07-09 14:19:58 +02:00
Luca 8fa043149b Update footprints on pcb 2021-07-09 00:08:53 +02:00
Luca 22502a1cab Add slots to outline to make room for screwing the case together 2021-07-08 23:17:45 +02:00
Luca 02e3e9c7b3 Generate USB ground plane 2020-08-14 22:29:40 +02:00
Luca 8332ebad4b Connect USB ground pads 2020-08-14 22:13:58 +02:00
Luca f48a64ab9a Connect PTC resistor to VBUS 2020-08-14 22:09:20 +02:00
Luca a62e0f681b Route USB D+/- 2020-08-14 21:07:45 +02:00
Luca bbe4bbd3dd Place USB 22 ohm resistors 2020-08-14 20:42:46 +02:00
Luca b81e8778f2 Connect 5.1k resistor to A5 2020-08-14 20:26:55 +02:00
Luca cb789a07f9 Connect 5.1k resistor to B5 2020-08-14 20:23:01 +02:00
Luca 17e09ba10a Flip ISP connector 2020-08-13 18:35:16 +02:00
Luca c4ec8bd306 Flip USB-C receptacle 2020-08-13 18:02:23 +02:00
Luca d32ae98068 Place sixth row of diodes 2020-08-13 17:53:30 +02:00
Luca 8de472ec5d Place fifth row of diodes 2020-08-13 16:04:36 +02:00
Luca 5ca2c91420 Place fourth row of diodes 2020-08-13 15:58:01 +02:00
Luca 9550adbb54 Place third row of diodes 2020-08-13 15:50:12 +02:00
Luca c4fa42a3b9 Place second row of diodes 2020-08-13 15:43:47 +02:00
Luca 49aef387b0 Place first row of diodes 2020-08-13 15:38:54 +02:00
Luca f9cc5884ac Update USB-C footprint 2020-08-02 17:27:06 +02:00
Luca 6b1bcfaf10 Move final row of LED caps 2020-08-02 01:22:14 +02:00
Luca 7c1c47ecc1 Move fifth row of LED caps 2020-08-02 01:16:36 +02:00
Luca 8c7b22fd25 Move fourth row of LED caps 2020-08-02 01:09:50 +02:00
Luca 6adf6df5ef Move third row of LED caps 2020-08-02 01:00:56 +02:00
Luca 4233f9a370 Move second row of LED caps 2020-08-02 00:50:23 +02:00
Luca 54db305637 Move first row of LED caps (again) 2020-08-02 00:35:12 +02:00
Luca 25c8d07e9c Finish re-placing LEDs + caps 2020-08-01 19:53:25 +02:00
Luca 1c08007c49 Re-place first half of LEDs (+ caps) 2020-08-01 19:19:34 +02:00
Luca a3889ccefd Make PCB corners rounded 2020-07-31 21:23:53 +02:00
Luca 92080f0385 Import new resistor 2020-07-31 21:12:41 +02:00
Luca 087ba1237a Move C64 so it does not interfere with stabilizers 2020-07-29 23:47:13 +02:00
Luca 8115be3ea1 Flip sixth row of caps 2020-07-29 23:38:41 +02:00
Luca 77724def20 Flip fifth row of caps 2020-07-29 23:32:46 +02:00
Luca 0b3613d6aa Flip fourth row of caps 2020-07-29 23:22:26 +02:00
Luca 27d034767f Flip third row of caps 2020-07-29 23:16:43 +02:00
Luca 1cd9a549ef Flip second row of caps 2020-07-29 23:08:13 +02:00
Luca 2905bac85d Flip first row of capacitors 2020-07-29 23:02:57 +02:00
Luca 055c236f9e Reload netlist 2020-07-25 18:46:19 +02:00
Luca dff5536ab7 Apply updated footprint 2020-07-25 17:23:18 +02:00
Luca 61e08bdbe2 Move 5.1k resistors away from decoupling capacitor 2020-07-25 00:48:59 +02:00
Luca 4ef906538e Place remaining LED decoupling capacitors 2020-07-25 00:43:28 +02:00
Luca 08663d32e7 Place first half of LED decoupling capacitors 2020-07-25 00:16:15 +02:00
Luca b65e605936 Place sixth row of LEDs 2020-07-24 23:02:24 +02:00
Luca aeb5143fe5 Place fifth row of LEDs 2020-07-24 22:55:36 +02:00
Luca 928384911c Place fourth row of LEDs 2020-07-24 22:48:09 +02:00
Luca 81624ec0f4 Place third row of LEDs 2020-07-24 22:39:15 +02:00
Luca e081bd8514 Place second row of LEDs 2020-07-24 22:26:20 +02:00
Luca 6c021ec2ea Place first row of LEDs 2020-07-24 22:13:07 +02:00
Luca 91e208edd0 Place USB-C/MCU capacitors/resistors 2020-07-24 21:54:20 +02:00
Luca 5ca08a4b15 Place MCU 2020-07-24 21:28:55 +02:00